Skip to content
Hold cleaning — riding crew

Supramax bulk carrier — Hold cleaning — riding crew

All five holds ready for the load port surveyor, with no commercial time lost to cleaning.

This is a scope pattern — how we approach a job of this shape — rather than a write-up of one specific contract. Real, permission-cleared case studies are published as they become available.

The problem

Five holds carrying petcoke residue, with a grain-clean requirement at the next load port and only a six-day ballast passage available.

How we worked it

An eight-person riding crew joined at the discharge port and worked the holds in sequence across the passage, sweeping and washing forward-to-aft so completed holds had maximum drying time.

What the approach is built to achieve

All five holds ready for the load port surveyor, with no commercial time lost to cleaning.

The service behind it

Hold Cleaning Riding Crew

Teams that sail with the vessel and complete every hold on passage — zero port time lost.

Full service details
Get in touch

Ready when you are.

Tell us the vessel, the port and the window. You get a scope, a crew size and an honest duration — usually the same working day.